Fixed-quote house demolition, partial demolition, pool and shed removal for Horsham and Wimmera & Western Victoria — with asbestos, permits, disconnections and disposal handled for you.
Horsham's older stock — interwar weatherboards near the CBD, post-war homes toward Haven, and farmhouses across the Wimmera — is squarely in the asbestos era, with fibro sleep-outs and asbestos-cement dairy roofs a rural specialty. A big share of our Horsham work is farm clearances: the old house plus the dairy plus three sheds in one mobilisation, which is dramatically cheaper than four separate jobs.
The Wimmera's famous grey and black cracking clays shape the site works. They dig hard and dry in summer, sticky in winter, and any rebuild needs the footing holes and tank voids backfilled with controlled, compacted fill — uncontrolled fill in cracking clay is a slab problem waiting to happen. Summer demolition here also means serious dust suppression and respecting total fire ban days for hot works.
Regional prices, not Melbourne prices. Typical Horsham jobs:
| Job | Typical range |
|---|---|
| Single-storey house (all-in) | $15,000–$25,000 |
| Double-storey / full brick house | $22,000–$40,000 |
| Partial demolition (extension, section) | $4,000–$12,000 |
| Pool removal | $5,000–$18,000 |
| Shed / garage | $500–$5,000 |
| Permits + Section 29A (we arrange) | $800–$2,500 |
Every job is different — asbestos extent, construction and access drive the price. A free site assessment gets you a fixed number.
Demolition in Horsham needs a building permit through a registered building surveyor and Section 29A consent from Horsham Rural City Council (about $100, 15 business days). Local wrinkle: blocks in Horsham's flood-prone areas along the Wimmera River carry overlay conditions that matter for the rebuild, and older CBD-fringe properties can carry heritage controls. We run the VicPlan check on day one.
Machines are on site 3–7 days for most houses. End to end — Section 29A consent, building permit, service abolishments, asbestos removal, demolition, levelling — allow 4–8 weeks. We lodge every approval and book every disconnection the day you accept.
It's identified in a pre-demolition survey, removed first by licensed removalists, transported wrapped and disposed at a licensed facility — and you receive the clearance and disposal dockets. On pre-1990 Horsham homes this is stage one of the job, priced in the quote.
Yes — Horsham is a base, not a boundary. We service Dimboola, Nhill, Warracknabeal, Stawell, Ararat, Murtoa, Natimuk, St Arnaud and everywhere between, including farm building clearances. Travel is built into the fixed quote, never a surprise line item.
Answer a few quick questions and get a plain-English read on the building permit, Section 29A consent and planning triggers for your demolition.
Run the 60-second permit check →