Demolition guides

Straight answers from people who take down regional Victorian houses for a living.

What house demolition really costs in Victoria (2026)

What it actually costs to demolish a house in Victoria in 2026 — per square metre, by construction type, plus asbestos, permits, disconnections and the extras quotes leave out.

Read the guide →

Demolition permits in Victoria: what's actually required

Every permit and consent you need to demolish a house in Victoria — the building permit, Section 29A council consent, when planning permits apply, costs and timeframes.

Read the guide →

Asbestos and demolition: the pre-1990 reality

Why almost every pre-1990 Australian home contains asbestos, where it hides, what licensed removal costs, and the rules that govern demolition in Victoria.

Read the guide →

The demolition process, step by step

From first site visit to a clean, level block — the nine stages of a professional house demolition, how long each takes, and what good work looks like.

Read the guide →

Partial vs full demolition: the honest decision guide

Removing an extension, a fire-damaged wing or the back half for a renovation — when partial demolition makes sense, what it costs, and when full demolition is honest value.

Read the guide →

Knock-down-rebuild: the regional Victoria playbook

The full knock-down-rebuild equation for regional Victoria — demolition costs, timelines, how KDR compares with renovating, and the traps between demolition and build.

Read the guide →

Service disconnections: the step that sets your demolition date

Every service that must be permanently abolished before a house demolition in Victoria — who to call, what it costs, and why the 2–4 week lead time drives your whole schedule.

Read the guide →

Salvage and recycling: what your old house is worth

Red bricks, hardwood, corrugated iron, scrap steel — what materials in an old regional home are worth money, how salvage credits work, and where recycling saves tipping fees.

Read the guide →

10 questions that expose a cowboy demolisher in minutes

The exact questions that separate professional demolition contractors from cowboys — licensing, asbestos, insurance, disposal dockets — and the answers you should hear.

Read the guide →

Site clearing: from rubble to builder-ready block

What happens between 'house down' and 'builder-ready block' — footing removal, fill, compaction standards, tree and stump clearing, and the finish specs that matter.

Read the guide →

How long does demolition take? The honest timeline

Days on site by house type, the 4–8 week real-world timeline including permits and disconnections, and what stretches or shrinks a demolition schedule.

Read the guide →

Pool removal: filling in or digging out, done properly

What it costs to remove or fill in a swimming pool in regional Victoria — partial vs full removal, fibreglass vs concrete, permits, drainage rules and what happens to the land after.

Read the guide →

Shed and garage demolition: small jobs, done properly

What it costs to demolish a shed, garage, bungalow or dairy in regional Victoria — asbestos in old outbuildings, when permits apply, and doing it as part of a bigger job.

Read the guide →

Not sure what permits your job needs?

Answer a few quick questions and get a plain-English read on the building permit, Section 29A consent and planning triggers for your demolition.

Run the 60-second permit check →