HomeGuides

Asbestos and demolition: the pre-1990 reality

Bluestone Demolition · Regional Victoria · Updated July 2026

Here's the fact that shapes every demolition quote in regional Victoria: if your house was built before 1990, it almost certainly contains asbestos. Australia used asbestos cement products heavily from the 1940s until the late 1980s, and didn't ban asbestos outright until 31 December 2003. Demolishing around it isn't optional — it's the law, and it's the first thing a professional prices.

Where it hides in a typical regional home

Brick homes are not exempt: the eaves, infill panels and wet areas of a 1970s brick veneer are usually asbestos cement.

The rules in Victoria

What it costs

Era cheat sheet

Bonded vs friable: why the distinction drives the price

Bonded (non-friable) asbestos — fibres locked in cement sheet — is the common case and the manageable one: sheets are wetted, unscrewed whole where possible, wrapped and carted. Friable asbestos — anything crumbling, fire-damaged, water-damaged, or naturally loose like pipe lagging and low-density board — releases fibres freely and jumps the job to a Class A removalist with enclosures, negative-pressure controls and air monitoring. This is why fire-damaged and long-derelict houses quote higher than their size suggests: the fire turned cheap bonded sheeting into expensive friable material. It's also why "she'll be right, it's only fibro" is the most expensive sentence in demolition — one crushed sheet under a machine track can convert a routine strip into a contaminated-site remediation.

What your neighbours should see

A professional asbestos stage looks reassuringly boring: signage up, area cordoned, suited operators hand-removing wetted sheets into plastic-lined transport, no dust, no smashing. If a demolition near you ever looks like asbestos-era cladding going through a machine dry, that's a WorkSafe call — for your own lungs' sake.

What a good contractor does

Surveys before quoting, names the licensed removalist, includes removal and disposal as a priced line item, and hands you the disposal dockets and clearance certificate afterwards. A quote that "excludes hazardous materials" on a 1960s house isn't cheaper — it just hasn't told you the real number yet. Our calculator builds an asbestos allowance from your home's era so the estimate you see is the honest shape of the job.

Want a number for your job? The cost calculator gives a realistic itemised range in 30 seconds, and a free site assessment turns it into a fixed written quote.

Not sure what permits your job needs?

Answer a few quick questions and get a plain-English read on the building permit, Section 29A consent and planning triggers for your demolition.

Run the 60-second permit check →